The revamping of the existing facilities

  • The installation of a new turbo compressor on PF2 to extend the gas lift system capacity.
  • The installation of a 3rd turbo generator and the modification of electrical network to increase the electrical generation.
  • Connecting all different circuits between the PF3 and the other platforms including all necessary system modifications.