The revamping of the existing facilities
- The installation of a new turbo compressor on PF2 to extend the gas lift system capacity.
- The installation of a 3rd turbo generator and the modification of electrical network to increase the electrical generation.
- Connecting all different circuits between the PF3 and the other platforms including all necessary system modifications.