Presentation DCA Project

The D.C.A. Project took place between 1981 and 1987 at a total budget of $ 650 million USD2013. This was the first major project completely managed by SEREPT and which achieved a local integration higher than 50% due to the fact that the Project management and two major contracts were carried out by local companies (the fabrication of the new platform and the drilling of ten wells).

The Project has succeeded to overcome the production decline through the following:

 

DCA.jpg

HSSE Policy : Presentation of our Health, Safety, Security and Environment Policy.
Code of Conduct : Presentation of our Code of conduct depicting the values and principles of our society.

USEFUL LINKS

Weather Tunisia http://www.meteo.tn/
Timetables of trains in Tunisia http://www.sncft.com.tn/
National Health Insurance Fund http://www.cnam.nat.tn/
The Tunisian Government Portal http://fr.tunisie.gov.tn/
Read more >>

AVIS DE VENTE DE MATERIEL ROULANT

Follow us on