The new platform PF3 (2nd platform fabricated in Tunisia)

  • The realization of a remotely controlled satellite platform. It consists of 6 piles, 18 slots and the necessary equipment for drilling, process, utilities, safety and a temporary accommodation quarter for drilling operations.
  • The laying of an electrical cable and the submarine pipes connecting the new platform to the other existing ones.

DAA.jpg

 

AVIS DE VENTE DE MATERIEL ROULANT

Follow us on Follow-us on Facebook Follow-us on Youtube