The new platform PF3 (2nd platform fabricated in Tunisia)

  • The realization of a remotely controlled satellite platform. It consists of 6 piles, 18 slots and the necessary equipment for drilling, process, utilities, safety and a temporary accommodation quarter for drilling operations.
  • The laying of an electrical cable and the submarine pipes connecting the new platform to the other existing ones.

DAA.jpg

 

HSSE Policy : Presentation of our Health, Safety, Security and Environment Policy.
Code of Conduct : Presentation of our Code of conduct depicting the values and principles of our society.

USEFUL LINKS

Weather Tunisia http://www.meteo.tn/
Timetables of trains in Tunisia http://www.sncft.com.tn/
National Health Insurance Fund http://www.cnam.nat.tn/
The Tunisian Government Portal http://fr.tunisie.gov.tn/
Read more >>

AVIS DE VENTE DE MATERIEL ROULANT

Follow us on