Our History

-1940-1932

Start-Up

Start-Up

 

 

 

 

 

 

 

 

  • 10 wells drilled from 1932 to 1940 (1000 m on average per well):
    • The first well is drilled in the valley Medjerda halfway between El Bab and Medjez Testour: Slouguia 1 (490 m) in 1932,
    • The deepest well drilled Haroun El 1938-1940 northwest of Bizerte reached 2779 m.
    • The first significant clue: July 25, 1936, gas wells drilled on the North Elkebir side of Ain ​​Ghlal (South Bizerte).

Puit_main2.jpg

 

Follow us on Follow-us on Facebook Follow-us on Youtube