The ASHTART reservoir is already depleted, therefore artificial lifting was required.
Serept uses only two techniques to lift its wells:
In addition to the above methods, Serept drilled six (06) injector wells to maintain reservoir pressure.
18-12-2024
07-12-2024
Procurement Contact