Artificial lift methods in the ASHTART Wells
The ASHTART reservoir is already depleted, therefore artificial lifting was required.
Serept uses only two techniques to lift its wells:
- 40 wells by Gas lift
- 02 wells using ESP pumps, it was installed for the first time in 2005.
In addition to the above methods, Serept drilled six (06) injector wells to maintain reservoir pressure.