The ASHTART reservoir is already depleted, therefore artificial lifting was required.
Serept uses only two techniques to lift its wells:
In addition to the above methods, Serept drilled six (06) injector wells to maintain reservoir pressure.
08-10-2025
01-10-2025
SEREPT hosts students from different backgrounds to perform exclusively internship mandatory graduation (PFE, Memory, etc.)
Procurement Contact