Currently, Serept hold two (02) fixed drilling rigs :
- CTF Rig 05, installed on the platform PF3 since 2012, which was served twice as a WORKOVER Rig in the platform PF2. This Rig is designed for drilling and workover operations.


Casing design :
It is worth mentioning that :
- All wells are deviated.
- The casing design is as follow :

Conductor pipe 26" :
- Maintain unstable and soft surface formations
- Mean length : +-160m
Surface casing 20" :
- Isolate and protect surface aquifers
- Mean length : +-300m
Intermediate casing 13 3/8" :
- Isolate and protect surface aquifers
- Mean length : +-1500m
Production casing 9 5/8" :
- Isolate and protect producing zones
- It could be used to set the production packer
- Mean length : +-2100m
Production Liner 7” or 5" :
- Isolate and protect producing zones
- For the installation of the completion equipment
- Cemented to the liner hanger.