Artificial lift methods in the ASHTART Wells

The ASHTART reservoir is already depleted, therefore artificial lifting was required.

Serept uses only two techniques to lift its wells:

  • 40 wells by Gas lift
  • 02 wells using ESP pumps, it was installed for the first time in 2005.

In addition to the above methods, Serept drilled six (06) injector wells to maintain reservoir pressure.

HSSE Policy : Presentation of our Health, Safety, Security and Environment Policy.
Code of Conduct : Presentation of our Code of conduct depicting the values and principles of our society.

USEFUL LINKS

Weather Tunisia http://www.meteo.tn/
Timetables of trains in Tunisia http://www.sncft.com.tn/
National Health Insurance Fund http://www.cnam.nat.tn/
The Tunisian Government Portal http://fr.tunisie.gov.tn/
Read more >>

AVIS DE VENTE DE MATERIEL ROULANT

Follow us on Follow-us on Facebook Follow-us on Youtube