Drilling Rigs

Currently, Serept hold two (02) fixed drilling rigs :

  • CTF Rig 05, installed on the platform PF3 since 2012, which was served twice as a WORKOVER Rig in the platform PF2. This Rig is designed for drilling and workover operations.

Drilling Rigs

Drilling Rigs

Casing design :

It is worth mentioning that :

  • All wells are deviated.
  • The casing design is as follow :

Casing Design

Conductor pipe 26" :

  • Maintain unstable and soft surface formations
  • Mean length : +-160m

Surface casing 20" :

  • Isolate and protect surface aquifers
  • Mean length : +-300m

Intermediate casing 13 3/8" :

  • Isolate and protect surface aquifers
  • Mean length : +-1500m

Production casing 9 5/8" :

  • Isolate and protect producing zones
  • It could be used to set the production packer
  • Mean length : +-2100m

Production Liner 7” or 5" :

  • Isolate and protect producing zones
  • For the installation of the completion equipment
  • Cemented to the liner hanger.
HSSE Policy : Presentation of our Health, Safety, Security and Environment Policy.
Code of Conduct : Presentation of our Code of conduct depicting the values and principles of our society.

USEFUL LINKS

Weather Tunisia http://www.meteo.tn/
Timetables of trains in Tunisia http://www.sncft.com.tn/
National Health Insurance Fund http://www.cnam.nat.tn/
The Tunisian Government Portal http://fr.tunisie.gov.tn/
Read more >>

AVIS DE VENTE DE MATERIEL ROULANT

Follow us on Follow-us on Facebook Follow-us on Youtube